DESCRIPTION

BJCHI has both the expertise and experience in executing large-scale international modularization projects.  Modularization work entails putting together steel structures, piping spools, equipment such as compressors, pressure vessels and heat exchangers, and electrical and instrumentation systems into a module as per design specifications. While modular-ization significantly cuts construction costs, helps optimize site manpower resources and overcome extreme site limitations for clients, it requires more advanced engineering, large shops and land with modularization yards strategically located near the port. BJCHI fabricates steel components in the 30-plus manufacturing shops at its main factory in Nikompattana. Then, the modularization processes are completed at one of four (4) pre-assembly and modularization yards, which are located next to Sattahip and Maptaphut ports.

PROJECTCUSTOMERSCOPE TYPEWORK VOLUMEPERIOD
CHEMICAL AND REFINING INTEGRATED SINGAPORE PLANT PROJECT (CRISP)EXXONMODULARIZATIONF16,4002022-2024
CHARLIE’S DECK & PLATFORM FABRICATION AND TRANSPORTATIONPROJECT (BUALUANGPLATFORM)OPHIRMODULARIZATIONF1,900 TONS2018 – 2019
REPLICANT FPSO COMPRESSION MODULES PROJECTTUPI BVMODULARIZATIONF & E16,500 TONS2015 – 2017
PETROBRAS FPSO P75 & P77 PROJECTQGI MODULARIZATIONF17,000 TONS2014 – 2016
WHEATSTONE LNG PLANT PROJECT (AUSTRALIA)ENTREPOSETANK FABRICATION MODULARIZATIONF2,300 TONS2014 – 2015
ROY HILL IRON ORE PROJECTLAING O’ROURKECONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF6,000 TONS2014 – 2015
CAPE LAMBERT PORT B PROJECT, PHASE A, B, CLAING O’ROURKECONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF11,800 TONS2012 – 2014
APLNG UPSTREAM PROJECTALCANNATURAL GAS PRE-TREATMENT FACILITIES (WELLHEAD SEPARATOR AND PRE-ASSEMBLY UNIT)F13,000 TONS2011-2015
FMG SOLOMON PROJECTLAING O’ROURKECONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF1,400 TONS2011 – 2012
RAPID GROWTH 5 (RGP 5) PROJECT UNITED GROUP CONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF4,400 TONS2009 – 2010
ALCAN GAS FILTER HOUSE UNIT PROJECT (AUSTRALIA)ALCANGFH EQUIPMENT FABRICATIONF & E1,200 TONS2006
ALCAN LIQUOR PURIFICATION UNIT PROJECT (AUSTRALIA)ALCANLPU EQUIPMENT FABRICATIONF & E8,000 TONS2006
ALCAN CALCINATION 661-601 PROJECT (AUSTRALIA)ALCANCALCINATION EQUIPMENT FABRICATIONF8,000 TONS2005

เราใช้คุกกี้เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้เว็บไซต์ ท่านสามารถศึกษารายละเอียดนโยบายคุ้มครองข้อมูลส่วนบุคคลได้ที่ นโยบายคุ้มครองข้อมูลส่วนบุคคล We use cookies to optimize and good the experience of using the website. You can study the details of the Personal Data Protection Policy in Personal Data Protection Policy

Privacy Preferences

-

Accept All
Manage Consent Preferences
  • คุกกี้ที่จำเป็น
    Always Active

    ประเภทของคุกกี้มีความจำเป็นสำหรับการทำงานของเว็บไซต์ เพื่อให้คุณสามารถใช้ได้อย่างเป็นปกติ และเข้าชมเว็บไซต์ คุณไม่สามารถปิดการทำงานของคุกกี้นี้ในระบบเว็บไซต์ของเราได้

  • คุกกี้ในส่วนวิเคราะห์

    คุกกี้ประเภทนี้จะทำการเก็บข้อมูลการใช้งานเว็บไซต์ของคุณ เพื่อเป็นประโยชน์ในการวัดผล ปรับปรุง และพัฒนาประสบการณ์ที่ดีในการใช้งานเว็บไซต์ ถ้าหากท่านไม่ยินยอมให้เราใช้คุกกี้นี้ เราจะไม่สามารถวัดผล ปรับปรุงและพัฒนาเว็บไซต์ได้

Save